Wastewater Treatment equipment manufacturer including grit master grit washer, grit conveyor, helical skimmers, nonmetallic helical skimmers, non-metallic helical skimmers, gritmaster grit washer, rotary scum skimmers, dipping trough skimmers, flight monitoring system, DAF, Plate settlers, and Hydropneumatic systems for Water and Wastewater Treatment applications

 

SPECIFICATIONS - NON-METALLIC HELICAL SKIMMERS


1.0 - GENERAL

Helical scum skimmers shall be suitable for installation in rectangular sedimentation tanks as shown on the drawings. Each skimmer shall be designed for operation in a ____ foot wide basin in which the normal water surface may vary 2 inches from the normal elevation of ____. The equipment shall be supplied by a manufacturer with 10 years experience in similar equipment, "Non-Metallic Helical Skimmer" by Polytech Systems, Inc. or engineer approved equal.


1.1- OPERATION

Each skimmer shall effectively remove sewage scum and floating materials from the sedimentation tanks and discharge it into a scum trough as shown on the drawings. ____ skimmer assemblies shall be provided per tank.


1.2 - DESIGN

Each skimmer shall consist of two helical reels formed as one integral component on a center tube without mechanical attachment, and include divider wall-mounted sprockets, drive chain and guard, and drive unit. Assemblies shall include beach plate and end cap bearings. Neoprene wipers shall be bolted onto the integral helical reel sections for efficient wiping action.


1.3 - MATERIALS

Skimmer Body shall be 150-PSI filament wound FRP tubing formed with premium grade vinylester resin and have a beige color gel coat. UV inhibitors shall be added to the vinylester during the forming process for maximum UV protection. Two (2) 6 inch x 1/4" thick 180 degree helical shape reels shall be formed integrally, equidistant around the periphery of the center tube and shall be fabricated from a single mold running the length of the center tube, plus extended each end per manufacturers recommendations.


2.0 - HELICAL REEL

Each helical reel shall be bonded to the center tube at time of forming with 6" wide, 1-1/2 oz mat from the center of the helical shape to a minimum length of 3" onto the pipe center body for a minimum 3/8" thickness each side. A neoprene or synthetic rubber strip shall be bolted through the non-metallic spiral blades by use of a steel clamp bar and back-up hardware. Mounting hardware shall be 316 stainless steel. The spiral blades shall be formed perpendicularly to the centerline of the pipe. For each reel unit, two (2) helical blades molded diametrically opposite on the center pipe. Each blade shall be pitched to complete one spiral in the length of pipe and shall have a 1-foot 6-inch diameter. The helical blade of the adjacent unit on the same side of the scum trough shall have its pitch in the opposite direction. Maximum deflection per reel unit shall be 1/4-inch.


2.1 - REEL SHAFT

All center tube or reel shafting shall be formed of 150 PSI filament wound FRP pipe of sufficient and ample size to transmit the power required. Inner pipe ends shall be flanged with 150 PSI FRP flanges fabricated from premium grade vinyl ester resin with UV inhibitors to form a flange to the flange spool.


2.2 -BEARING ASSEMBLIES

Each reel unit shall have two 316 series stainless steel shaft ends mounted in a wall ring type with a U.H.M.W. insert bearing located generally as shown on the drawings. Bearings shall be provided with industrial type lubrication fittings with stainless steel grease tubing extended up to the operating walkways. Bearing assemblies shall be aligning.


2.3 - DRIVE CHAIN

Drive chain shall be non-metallic NH-78 manufactured of a reinforced nylon resin with stainless steel pins. Chain shall consist of 2.609 inch pitch links, and shall have a minimum working load of 1740 pounds.


2.4 - SPROCKETS

The collector chain drive sprockets shall have chain-saver rims and shall be split construction to facilitate installation. Sprockets shall be 100% cast nylon-6. All sprockets to be compatible with non-metallic chain.

The DRIVING SPROCKET shall be provided with key way and set screw for attachment to the reducer shaft. Sprockets and hub assembly shall be 100% cast nylon-6 with shear pin hubs. Drive sprockets requiring jaw clutches shall be 100% cast nylon-6.

The DRIVEN BULL SPROCKETS shall be split construction to facilitate installation. Sprockets shall be provided with key way and set screws for attachment to head shaft. Sprockets shall be 100% cast nylon-6.


3.0 - DRIVE UNIT

The drive unit shall consist of an electric motor and helical gear reducer, complete with properly sized shear pin, driving two ____ foot long helical reel units by means of two output shafts with a driver sprocket on each shaft connected to a driven sprocket. Two drive units shall be provided for each primary tank. Gear reducer shall have an AGMA service factor rating of 2.0 and shall be equipped with anti-friction bearing with a bearing life of 25,000 hours, minimum. Gears shall be steel, cut to accurate form and encased in a heavy moisture and oil proof case. The helical reel speed shall be 1 rpm with the drive unit operated at 1.75 rpm with an output ration of 1000 to 1. The coating shall be for corrosive overload protection and independent operation shall be provided. Approved drive unit enclosures shall be provided.


3.1 - DRIVE MOTORS

The drive motor shall be rated 460 Volts, 3-phase, 60 Hz, 3/4 hp minimum, 1.800 rpm, horizontal, TEFC, with a 1.00 service factor. Motor shall comply with this specification in all other respects and all other reference specifications.

Nameplate Information ( for reference only)



 4.0 - SPARE PARTS AND SPECIAL TOOLS

The following spare parts and special tools shall be furnished. All parts and tools shall be suitably marked and boxed for shipment and storage.

ITEM
Drive chains, complete for one tank
Shear pins
Complete flexible wiper set an mounting hardware
Plate ring babbitted bearings
Wall ring babbitted bearings


4.1 - ACCESSORIES

Lifting lugs: Equipment or components over 100 pounds in weight shall be provided with lifting lugs.
Anchor bolts: Provide anchor bolts, submit size, material and design in accordance with section______________.


 4.2 - EQUIPMENT IDENTIFICATION PLATE

A 16 gauge type 316 stainless steel identification plate shall be securely mounted on all equipment in a readily visible location. The plate shall bear the 1/4 inch die-stamped equipment number indicated in this specification and shown on the drawings. Stamped equipment shall include the mechanism drives and the torque switch devices.


5.0 - WORKMANSHIP

General - All parts of all equipment shall be amply proportioned for all stresses that may occur during fabrication, shipment erection and intermittent or continuous operation. Workmanship shall be of high grade in all respects.


5.1 - PAINTING

Shop and finish painting shall be in accordance with, and as specified in section PAINTING _______.


5.2 - FIELD TESTS

Functional Test - Prior to tank start-up, all equipment shall be inspected for proper alignment, quiet operation, proper connection and satisfactory performance by means of a functional test. Any deficiencies in alignment, operation, connection and satisfactory performance shall be corrected prior to manufacturer's certification.


5.3 - MANUFACTURER'S CERTIFICATION

The supplier or his representative shall certify the correctness of the installation.


5.4 - PREPARATION FOR SHIPMENT

Equipment shall be prepared and protected for shipment and shipped a follows. Insofar as is practical, the equipment specified herein shall be factory assembled into components as large as may be practically shipped, in order to minimize field assembly requirements. The parts and assemblies that are of necessity shipped unassembled, shall be packaged and tagged in a manner that will protect the equipment from damage and facilitate the final assembly in the field. Generally, unpainted machined parts shall be protected from damage by the elements with the application of a strippable protective coating. Provide all lubricants required for initial lubrication. There will be no storage allowed in the plant warehouse.


5.5 - GENERAL

Payment for the work in this section will be included as part of the lump sum bid amount stated in the Proposal.

 